					Source: http://www.doksinet  Air conditioning systems with gas absorption heat pumps Natural gas/LPG fired  Gambro Dasco S.pA Medolla (Modena), Italy  A unique combination  considerably different: actually,  water-ammonia absorption  It’s not easy to find thermal  the temperature of the  chillers. In this particular case  storage systems combined  antifreeze (water-glycol)  the utilisation of variable phase  with absorption chillers.  solution can go well below  storage systems, it’s even  The main reason is the  0 °C, which allows full  more attractive than standard  incompatibility of lithium  compatibility with thermal  ice storage. The installation of  bromide absorption chillers  storage systems.  such a system in a small sized  and outlet temperatures below  The application described  office building demonstrates  0 °C. The situation of water-  below is a good example of  the huge potential for the  ammonia absorption chillers is  thermal storage coupled with  construction
industry.   Source: http://www.doksinet  Gambro Dasco S.pA, Italy  Robur Case History  BUILDING DESCRIPTION Floors  nr. 2-floor building: ground level and first floor  Surface  2512 m2  Heating capacity  291.3 kW  Cooling capacity  190.8 kW  Absorption with thermal  The application  The Cooling/Heating System  Installed equipment  energy storage  The HVAC system, installed  The HVAC system of the  The outdoor thermal station  Although uncommon when  at the Gambro Dasco S.pA  conference rooms combines  consists of a gas fired water-  applied to absorption  factory in the city of Medolla  a primary air system with fan  ammonia absorption system,  refrigeration systems,  (Italy), serves a 2-story building,  coils. In particular, the primary  manufactured by Robur and  the use of a thermal storage  including offices and  air system consists of an air  composed with different  system can lead to  conference rooms.  treatment unit combined with  models, as follows:  considerable energy
savings  The 1269 m2 ground floor and  ductwork and diffusers,  • 1 factory-assembled  and gas emission reductions,  the 1243 m2 first floor, cover  customized for the building;  absorption heat pump link  as experienced by this medical  a combined area of 2512 m2,  air treatment unit and fan coils  RTAR300-600 CC  equipment company.  while the average floor height  are directly linked (by means  (nr. 5 GAHP-AR units);  The expansion of the medical  is about 3.2 m  of a hydronic loop to the  • 2 factory-assembled  equipment company Gambro  The company has  outdoor thermal system.  absorption chiller links  Dasco S.pA, generated the  approximately 105 employees:  In the offices, heating and  RTCF180-00 LB  opportunity to install a new  55 of them usually work on  cooling is provided by fan coils  (nr. 6 ACF60-00 LB units);  cooling & heating system,  the ground floor, 50 of them  connected to the same  • 1 factory-assembled link  which could guarantee the  on the second floor.
 hydronic loop.  (specifically configured for  needed comfort level.  Besides the HVAC system,  this application) consisting  The system was designed  an on-demand water heater  of 2 absorption chillers  with care considering high  system coupled with a plate  ACF60 HR (with heat  efficiency, energy savings and  heat exchanger produces hot  recovery) coupled with 2 high-  low environmental impact.  water for sanitary use.  efficiency outdoor heating  This is the proof of the social  The building requires a heating  modules (boilers) AY00-119.  and environmental corporate  capacity of 197 kW and a  The outdoor thermal station is  responsibility that justifies a  cooling capacity of 285 kW.  integrated by an ice storage  higher initial investment.  system, with 2 storage tanks   Source: http://www.doksinet  Gambro Dasco S.pA, Italy  Robur Case History  and a heat exchanger.  2 absorption chillers with heat  required to recharge the plant  produce chilled water at a  For the on-demand
production  recovery, running by day mode.  from 8:00 pm to 8:00 am.  temperature of 7 °C while the  of hot water for sanitary use,  As a result, a gas inlet of  The temperature of the  ACF60-00 LB chillers  an additional plate heat  50.6 kW can generate  water/glycol outlet is -7 °C,  connected with the storage  exchanger was installed.  35.44 kW cooling capacity  while inlet temperature is 2 °C.  tanks loop send chilled water  and 42 kW free heating output  Thermal energy is stored in  at 5 °C to the heat exchanger.  Energy Evaluation  simultaneously, covering the  storage tanks, containing the  Obviously, once the energy  The goal of obtaining the  needs of hot water for sanitary  PCM nodules by means of  stored in the tanks has been  highest efficiency from this  use. In summer, their combined  phase changing of the  depleted, the tanks are  application was obtained by  efficiency can reach an  nodules’ fluid solidifying at  completely cut off and the  the installation of gas
fired  outstanding rate of  a temperature of approximately  absorption chillers provide  water-ammonia heat pumps  approximately 153%,  3 °C and is then released by  the entire demand of  and chillers manufactured by  improving the performance of  day to the cooling system  thermal energy.  Robur. This gas absorption  the entire system.  through a heat exchanger.  The electronic control manages  Normally, the cooling demand  the entire system automatically.  technology gives heating efficiencies up to 140%  How the system runs  is entirely supplied by thermal  A multi-stage thermostat  (according to Modena, Italy,  In winter, only the GAHP-AR  storage tanks, in this case  switches on DDCs with this  average temperature conditions  units and the AY00-119  energy passes throughout  priority: first ACF60 HR and  provided by UNI 10349) thanks  high-efficiency boilers operate,  PCM nodules.  GAHP-AR units, then the  to recovering heat energy from  supplying the fan coils, the air  When the
demand of cooling  ACF60-00 LB units.  external air (renewable energy).  treatment unit as well as the  energy raises, the gas fired  In summer, the 2 independent  The number of heat pumps  plate heat exchanger for the  aabsorption chillers switch-on,  AY00-119 high efficiency  (GAHP-AR) is designed to  hot water production.  improving the total energy  boilers produce on-demand  cover the winter heating base  The outlet temperature to the  capacity. Finally, when the  hot sanitary water.  load while the boilers  hydronic loop is 50 °C, with  energy stored in the tanks is  However, when the ACF60 HR  (AY00-119) cover peak demand.  inlet water temperatures at  completely depleted, the  units become operational,  Thanks to an efficient  40 °C, and a combined heating  absorption chillers will supply  hot water is produced by  application, 7927 m3 of natural  capacity of 214 kW.  the entire air conditioning  means of free heat recovery,  gas are saved during winter.  GAHP-AR gas
absorption heat  demand. When air conditioning  avoiding unnecessary use of  Moreover, in winter the  pumps, controlled by a Robur  runs on thermal storage only,  the boilers and boosting overall  application can lead to a  Direct Digital Controller (DDC)  the system works as follows.  efficiency.  considerable reduction of  with five-step staging logic,  Once air conditioning is  Conclusion  14 Tons of carbon dioxide.  shall have the right of priority  switched on, the circulation  The utilization of thermal  Similarly, further arrangements  during winter.  pumps shift chilled fluid at 5 °C  storage systems with  were implemented to allow the  The two high-efficiency boilers,  from the thermal storage  absorption chillers is possible  installation of a lower cooling  managed by another DDC,  system to the heat exchanger.  with water-ammonia absorption  capacity and provide energy  become operational in case of  Then, energy passes through  refrigeration systems,  savings in summer. 
temperature or demand peaks,  the hydronic loop to the air  the only equipment providing  First, the installation of two  fitting into the system’s  treatment unit and fan coils  antifreeze solution at  thermal storage tanks with a  sequence with two-step staging  with a temperature of 7 °C.  a temperature below 0 °C.  capacity of 6500 litres of  logic. The control panel  When energy stored in the  Polyolefin nodules  integrating the 2 DDCs is  tanks is not adequate to satisfy  (manufactured by Cristopia)  managed by 2 on-off consent  demand, the absorption chillers  filled with PCM, Phase Change  switches, driven by a 2-step  become operational.  Material. Thanks to this  thermostat. The thermostat  A thermostat-driven control  arrangement, only 133 kW  switches on the heat pumps’  panel switch as on the  by day mode and 88 kW  DDC first, then the high  ACF60 HR units first, the  by recharge mode have been  efficiency boilers’ DDC.  GAHP-AR units second and  installed,
allowing savings  In summer, the process is  finally, in case of high demand,  of 64 kW on the installed  characterized by a 2-phase  the ACF60-00 LB chillers also.  capacity, 23% less than  operation: recharge by night  ACF60 HR and GAHP-AR units  necessary.  and running by day.  directly connected with the air  Second, the installation of  Six ACF60-00 LB units are  conditioning hydronic loop   Source: http://www.doksinet  Gambro Dasco, Italy  Robur Case History  Robur S.pA advanced heating and cooling technologies wwwroburcom export@roburit Via Parigi 4/6 24040 Verdellino/Zingonia (Bg) Italy T +39 035 888111 F +39 035 4821334